+-x÷, +用來計人工; -用來計成本 ; x用來計增長/衰退; ÷用來計資金/風險管理
2015年7月14日 星期二
US30 20150714
Below calculation requires some knowledge of wave theory and some high school math...
assume a ABC expanded flat is complete,
range of A=247;
range of B=357;
range of C=524 where
1.4453*A=B;
1.4678*B=C;
2.1215*A=C
take sq. root of 2.1215, we get 1.45654;
mean/average of 1.4453 & 1.4678 is 1.45655.
So, GM=AM but they rarely matches...
of course, most importantly, the rebound has reached 50% of the previous wave (not range)
沒有留言:
張貼留言
較新的文章
較舊的文章
首頁
訂閱:
張貼留言 (Atom)
沒有留言:
張貼留言